REFERENCES

  • Tupraş İzmit refinery steam turbine labyrinth seal manufacturing (Delivered)
  • Kangal Thermal Power Plant FGD Slurry Pump Manufacturing (Delivered)
  • Kangal Thermal Power Plant 1st Unit 150 MW AB-OB-YB steam turbine major maintenance (Completed)
  •    HP Turbine nozzle block – 4 pieces- replacement
  •    HP Turbine first rotating blades -90 pieces- replacement
  •    HP Turbine first stationary blades -112 pieces- replacement
  •    Governing system major maintenance
  • Kangal Thermal Power Plant 3rd Unit 157 MW Low Pressure Turbine Major maintenance (Completed)
  •    Low pressure turbine majör overahaul
  •    Replacement of bearings 1,3 and 4
  •    Replacement of labyrinths number 4
  • Kangal Thermal Power Plant 2nd Unit HP Turbine nozzle block manufacturing (Ongoing)
  • Kangal Thermal Power Plant Boiler Feed Pump Motor White Metal Bearing -diameter 160 mm- Manufacturing (Delivered)